Temporary Site Accommodation Buildings: Handover Checks

Temporary Site Accommodation Buildings: Handover Checks

Oct 30, 2026

Temporary site accommodation buildings are bought as a product and received as a project on site. The factory ships the unit; the site still has to set it on a level base, connect it and prove it works. Most disputes start in that gap, not in panel thickness or paint finish.

We have watched this gap open on projects in four continents, and it follows the same pattern: the quotation is read as a turnkey promise when it was only a supply scope, and nobody writes down who does what until the units are already on the ground. This page sets out what leaves the factory, what the site must do, and how to check the result on a workforce accommodation camp before the final payment.

What leaves the factory, and what does not

The delivery condition depends on the building type. Expandable units are transported in a folded configuration, while flat pack units arrive as separate structural and panel components for site assembly. The exact factory scope should be confirmed against the approved drawings and packing list for each model. What does not travel with any of them is everything that depends on the ground it lands on.

Type Delivered as Reference lead time
Flat pack unit Knocked down, bolted on site, 2,896 mm standard height, 3,300 mm on request 10–15 days
20ft expandable unit Folded at 5,900 × 2,200 × 2,480 mm, opened on site to 37 m² 20–25 days
40ft expandable unit Folded at 11,800 × 2,200 × 2,480 mm, one unit per 40HC Around 30 days

The lead times above are reference figures for factory production, counted from the confirmed order and not from the enquiry. They are indicative production lead times, subject to confirmed specifications, production scheduling and order conditions, and they are not a door-to-door period from order to arrival on site. They also assume a frozen configuration. Every change to layout, wall core or fitting after the order moves that date, which is why the configuration freeze deserves its own milestone.

The six duties that stay on site

These six items are site scope on every project we ship, unless a separate installation contract says otherwise in writing. On a workforce accommodation camp from China the factory scope rarely extends past the unit itself, so naming these duties in the purchase order is what prevents the argument later:

  • Foundations. Level, drained, and sized for the unit's loaded weight. A unit placed on uneven ground twists, and a twisted unit does not close properly.
  • Lifting and placement. Crane or telehandler capacity, rigging and lift plan belong to the site contractor. Lifting points are marked on the unit and specified in the drawing package.
  • Power connection. From the site distribution board to the unit's incoming point, including earthing and protection. Voltage and frequency at the site boundary must match the unit's electrical build.
  • Water and drainage. Supply, isolation and waste connection, including the fall on the drain run.
  • Stormwater and surface drainage around the footprint, so water does not stand against the base frame.
  • Permits and approvals. Temporary building consent, fire separation and siting distances are host-country matters, and they differ by jurisdiction.

On a phased site the foundation work is usually the bottleneck, not the units. Pouring or setting bases for forty units takes longer than opening forty folded units, so the base programme should lead the shipping schedule by several weeks.

Arrival checks, in the order that saves money

Inspect before the units are lifted off the truck where possible, and always before they are placed. Once a damaged unit is on its foundation and connected, the argument about when the damage happened becomes unwinnable. A temporary site accommodation inspection done in this order costs a morning; the same inspection done after placement costs a claim.

  1. Count against the packing list before signing the delivery note. Record shortages on the note itself, not in a later email.
  2. Photograph every unit on all four sides, at the level of the frame corners, before lifting.
  3. Check the base frame for distortion and the folding frame for bent sections. On expandable units this is the first thing to look at, because a bent frame will not seal.
  4. Open and close every door and window through its full travel. Sticking usually means the unit is not level yet, not that the joinery is wrong.
  5. Inspect the folding joints, corners, panel connections, and the openings and penetrations in the envelope. Check whether any site-applied sealant is specified in the installation instructions; all required sealing materials and application points should be identified before installation begins.
  6. Check the electrical panel, cable sizes and the position of the incoming point against the drawing, and confirm the unit is dry inside the panel.
  7. Inventory the accessory pack: fixings, connecting plates, downpipes, spare panels and touch-up paint. Missing fixings stop an installation as effectively as a missing unit.

The failures we see at handover

The following issues are common points to check during site handover. Some relate to site preparation, while others may require supplier inspection or corrective action:

  • Units set on a base that was never levelled, so doors bind and the folding joint sits open by a few millimetres.
  • Water allowed to stand against the base frame during the wet season, with no fall away from the footprint.
  • Electrical supply connected at a different voltage than the unit was built for, or without earthing.
  • Transport damage accepted silently at delivery, then discovered after placement.
  • Configuration changed after the order was frozen, so the delivered unit does not match the drawing the site is building to.

Each of these is cheap to prevent at the right moment and expensive to fix afterwards. That is the practical argument for a one-page modular building handover checklist agreed before the first shipment, rather than after the last one.

An expandable accommodation unit assembled and opened on the production floor before dispatch
A folded unit opened and checked on the production floor. The opening test here is the same one the site repeats after placement.

Documents to hold before you sign

A temporary building that has to satisfy an insurer, a client auditor or a local inspector needs paper as well as panels, and these temporary site accommodation buildings are inspected more often than permanent ones because they move. Before final payment, hold: the packing list and shipping documents, the structural and layout drawings issued for your order, the material and panel specification, the electrical drawing and load schedule, and the quality and management certificates your contractor status requires.

Those certificates are not all the same kind of document, and the difference matters at an audit. On our side, ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (occupational health and safety) are management system certifications: they describe how the company is run. EU CE is a conformity marking that applies to the products and specifications named in its declaration, not a certificate of a management system. Holding the three management certificates does not establish that a particular model carries CE marking for your destination, so ask for the declaration that covers the model and the standard you are buying against. Whether any of it satisfies your project is a question for your compliance route, not an assumption to make on our behalf.

Reuse, relocation and the second move

Temporary site accommodation buildings are bought on the assumption that they will move. They usually do, and the second site is where the economics are decided. Three things determine whether a unit survives a move: whether it was dismantled in the sequence it was built, whether the fixings and connecting plates were kept, and whether the panels were stored flat and dry rather than stacked on edge in the open.

We do not publish a number of moves a unit will survive, because it depends on handling and storage rather than on the panel itself. What we can say is that every move requires the foundation and connection work to be done again, and the arrival checks above to be repeated. A unit that passed handover once is not automatically ready for a second site.

Buying temporary site accommodation buildings from China

A construction worker accommodation manufacturer in China can only protect the factory half of the risk. The site half is protected by the documents you send with the order. Four items make the difference: the site plan with levels, the voltage and frequency at the connection point, the climate loads for the location, and a named person on site who owns the handover checklist.

For construction worker accommodation the checklist matters more than for a one-off office, because these buildings are bought in quantity and the same fault repeats across every unit. A workforce accommodation delivery inspection should follow the same sequence on every shipment rather than being improvised again at each site. Catching a fault on the first delivery costs one site visit; catching it after twenty units are connected costs a rectification programme.

When those four are in place, a modular workforce housing supplier is quoting against a defined scope instead of a description, and the comparison between two quotations becomes a comparison of the same thing. The same logic sits behind our site brief for construction camp accommodation, which is written to be filled in before the first enquiry rather than after the first shipment.

Frequently asked questions

Does the price include installation?

A supply quotation covers the units and their packing, not temporary accommodation installation or the rest of the site work. Installation can be contracted separately, and when it is, the scope has to state who provides lifting equipment, who does the electrical connection and who signs the handover. If a quotation does not say, assume supply only.

How much space does a unit need during installation?

An expandable unit needs clear working room on the opening sides for the folding panels to swing, plus access for the lifting equipment. Flat pack units need a laydown area for panels and a clear footprint for assembly. Both need a route the delivery vehicle can actually use, which is worth walking before the truck arrives.

Can units be stacked or put on a first floor?

Stacking and multi-storey layouts exist in our range, but they change the structure, the lifting plan and the foundation. Treat any stacked layout as a separate engineering request and ask for the drawings for the specific model, rather than assuming a ground-floor unit can be lifted onto another.

What if the site voltage does not match?

Tell us before the order is frozen. The electrical build is set to the destination at manufacture; adapting a unit afterwards means changing distribution, protection and fittings on site, which costs more than building it correctly the first time.

How many units fit in one container?

Two 20ft expandable units load into one 40HC; a 40ft expandable unit loads one per 40HC. Flat pack units pack by panel and frame rather than as a single body, so the count depends on the packing plan for your configuration and should be confirmed in writing with the order.

Agree the handover checklist before the first shipment

Send us the site plan, the connection voltage and the climate loads, and we will return a scope split that names every item on the factory side and leaves the site duties visible rather than implied.

Contact our project team with your site brief, or read sizing a prefab labor camp by bed count to fix the unit number first.

Get Free Quote

Get Free Quote
Ask Price Now  
Submit

Home

products

whatsApp

contact

Start a Conversation

Hi! Click one of our members below to chat on