Temporary building construction site container for office is based on the single container house as the the basic unit, the single unit is built through special section steel welding and bolt connection, the different units are connected by bolts.
Item No :
C-040Order(MOQ) :
1 setPayment :
50% deposite,50% before shipmentProduct Origin :
Guangdong provinceColor :
customizedShipping Port :
Nansha portLead Time :
10-15 daysWeight :
1500KGRemote Project Site Office with Meeting and Welfare Rooms


1. Product Overview
Wanbang's Remote Project Site Office with Meeting and Welfare Rooms is a modular office system built for projects located far from established infrastructure. Based on a standard 6055×2400×2896mm flat-pack module with a galvanized steel frame and bolted connections, it combines administration offices, meeting rooms and welfare facilities in one compact, quickly deployed building for construction, mining, energy and infrastructure sites.
2. Typical Applications
Suitable for remote site offices, project coordination and meeting rooms, client and engineer offices, HSE and training rooms, first-aid and welfare rooms, and combined office-with-rest-area layouts in construction, mining, oil and gas and infrastructure projects.
3. Layout and Capacity Options
Modules can be arranged as open-plan offices, partitioned manager or meeting rooms, and welfare spaces such as break and first-aid rooms. Multiple units can be linked by corridors or stacked into two-storey layouts to separate focused work from meeting and welfare functions; internal doors, windows and partitions follow the site's organizational plan.
4. Climate Adaptation
Structural, insulation and utility options can be adjusted for hot, cold, humid, coastal and high-altitude remote conditions. Glass-wool wall and roof insulation (A1 non-combustible), PVC flooring and concealed electrical systems support comfortable year-round use; specific climate packages should be confirmed against project drawings and local requirements.
5. Transport and Installation
Modules are shipped flat-packed to reduce container count and assembled on site with integral hoisting and bolted connections. Exact packing quantity, foundation requirements, crew size and installation duration must be confirmed by the engineering department based on the final layout and site conditions.
6. Camp System Integration
The site office can be integrated with workforce dormitories, ablution blocks, kitchens, dining halls, laundries, clinics and security cabins to form a complete camp, serving as the coordination hub that links management, welfare and operations areas.
7. Quality and Documentation
Wanbang can provide layout drawings, material lists, inspection reports, packing lists and installation manuals to support project approval and on-site assembly. Material and structural configurations are documented per the confirmed shop drawing; the applicable certification scope should be confirmed against the project's required standards.
8. Project Process
Typical project flow: requirement confirmation → layout design → quotation → shop drawing → production → inspection → shipping → installation support. Wanbang supports layout planning, module configuration, material selection, production, shipping planning and on-site installation guidance for overseas and remote sites.
Description
This container house specification as below
| No. | Item | Description | Size | QTY | Unit | Remark |
| Standard Size | 6055mm*2400mm*2896mm | 1 | set | |||
| includes | grayish white/ivory | |||||
| 1 | Frame | top frame | size:6000mm*2400mm*160mm,2.0mm thickness,160 high galvanized main beam,C90*30*1.6mm galvanized secondary beam, 20*20 square tube | 1 | set | The main beam and column are made of customized high-strength galvanized coils, with a galvanized layer of 100g/㎡. |
| bottom frame | size:6000mm*2400mm*140mm,2.0mm thickness 140 high galvanized main beam,C100*50*1.8mm galvanized secondary beam,L4 galvanized angle iron | 1 | set | |||
| steel column | size:150mm*150mm*2535mm,2.0mm thick galvanized column | 4 | pcs | |||
| Surface | Plastic powder baking varnish | 1 | set | The paint film adhesion is rated as level 1 | ||
| 2 | Roof | color steel tile | 0.5mm,grayish white,Workshop bite type | 1 | set | |
| glass wool+moisture-proof film | 100mm thickness,Volumetric weight 24kg/m3 | 1 | set | The combustion performance is A1 non-combustible | ||
| 193*2850 color Steel ceiling | 0.5mm thickness,Profile machine drawing forming, invisible nail | 1 | set | |||
| 3 | Floor | cement fibrillate plate | 18mm | 1 | set | |
| PVC floorslab | 1.8mm | 1 | set | |||
| 4 | Wall | Glass wool color steel composite sandwich panel | 0.376 outside color steel plate with orange peel, inner 0.326 color steel plate/50mm thickness/50kg glass wool, outside white gray or ivory white, inner white gray, size/1150mm*2535mm | 15 | pcs | Outer orange peel, inner plate |
| 5 | Window | Top-hung window | 900mm*500mm | 1 | set | |
| Shutters | 1150mm *440mm | 1 | set | |||
| 6 | Door | Steel door anti-theft lock | 840mm*2035mm | 1 | set | Right hand inward |
| 7 | Electrical System | Concealed electric box | 7-9 bits | 1 | set | |
| Leakage protection switch, air switch | 32A、16A | |||||
| Industrial plug socket | Voltage 220V, 50Hz, 3 poles, 32A | 1 | set | |||
| LED light | Light wire 2*1.5 square, 36W | 2 | set | |||
| Exhaust fan | 300mm*300mm | 1 | set | |||
| Socket (wall) | Socket line 3*2.5 square, 10A five holes | 4 | set | |||
| light switch | 1 | set | ||||
| 8 | Indoor edge | PVC angle line | Top and column packages are white, skirting is brown | 1 | set | |
| 9 | Drain | Flashing tank, gray | 2695mm/5695mm | 1 | set | |
| PVC drain pipe | 2720mm length*50MM | 4 | pcs |

Features
1.Fast installation – short installation time is guaranteed by the integral hoisting and bolt connection; well-equipped saves the decoration cost
2.Neat and spacious – neat and beautiful appearance
3.Flexible combination – the container houses can form office building, temporary residence and etc.
4.Structural safety – built with a galvanized steel frame and bolted connections; wind-resistance and seismic options can be engineered to meet project-specific site requirements.
5.Waterproof structure – its roof adopts structural drainage design
Our Projects
We have done many projects in China and oversea markets.

FAQ
1.What's the MOQ for one shipment?
At least 1 unit.
2.what's the production time for one bulk shipment?
Around 7-15 days after receive the deposit.
3.If you can customized the design when we have layout?
Yes,we can customized the products depands on your layout.
4.What's the payment method?
Our payment method usually T/T 50% deposit, and the balance 50% paid before shipment.
Hi! Click one of our members below to chat on