Wanbang supplied 200 container houses and 12 toilet houses for a road construction camp in Suriname. The second number is the one that decides whether the camp is usable.

Two Numbers, Not One

A purchase order for this kind of camp reads like one line: accommodation, 200 units. It is really two lines, and the second one carries the risk. The modular camp building range lists the types that usually travel together on one order — accommodation, ablution, canteen, office — because a camp is a set, not a building.

On the record Value What it drives
Accommodation 200 container houses Power, water and access load
Sanitation 12 toilet houses Discharge load and drain runs
Ratio About 17 units per toilet block Arithmetic: 200 ÷ 12
Application Road construction camp A site that moves along the works

Seventeen to one says these are shared blocks, not en-suites. The cubicle count per toilet house is what converts 12 into a headcount — without it nobody can say whether the camp holds 400 men or 1,200. And every one of the 200 units still needs a drain route to one of those 12.

What 200 Units Change That 20 Do Not

Twenty units is a site problem. Two hundred is a systems problem, and the systems are all outside the buildings. Our note on camp power load and distribution covers one of these in detail; the table lists the rest.

System At 20 units At 200 units
Power One feeder Distribution boards per block, load calculation, metering
Water One connection Storage tank, pressure set, ring main with isolation valves
Drainage Soakaway Septic or package plant, graded runs, desludging access
Access One track Hardened internal roads, turning circles, fire lane

The photograph below is that layer, not the building: a hardened strip between the rows, a distribution box with its own breakers on the wall, condensers in a line, pipework at skirting level. All of it is what fails first on a site this size.

Two rows of white container house units facing a concrete service strip, with wall-mounted distribution boxes, condensers and pipes at skirting level
The service face of a unit: hardened strip, wall-mounted breakers, condensers, pipework at the base. In a 200-unit camp this layer is larger than the buildings.

The Toilet Block Is Where Quotes Go Wrong

Twelve toilet houses cost a fraction of 200 accommodation units, which is why they get one line in the quote and three surprises on site. That line has to carry six things: cubicle count and split by sex, urinal and shower positions, hand-wash points, water supply method, discharge destination, and ventilation. Our guide to modular ablution blocks sets out how they are combined with accommodation.

A road contract usually runs a main camp plus forward posts that follow the works. That single fact decides whether the sanitation is built to stay or built to move. A block piped into a cast-in-place septic tank cannot follow a paving crew thirty kilometres up the alignment; a block on an independent tank, or a package unit, can. Decide it before the concrete goes down, because after that the pipes are where they are.

Suriname: Rainforest, Not a Season

Suriname is rainforest from the coastal belt to the interior, with no real dry season. The design case is permanent humidity rather than a wet month, and roofs are sized on storm intensity rather than annual total.

Element What permanent humidity asks for
Steel and fixings Coating specified for the service life; cut edges and drilled holes touched up
Ventilation Openable louvres and screens; a route for condensate
Roof and base Peak-intensity gutters; units raised clear of standing water

A second issue has nothing to do with weather. The population and the port sit on the coast; the interior is reached by river and a thin road network. On a road contract, the road being built is often the road to the camp. Quote delivery to the site gate, not to the port — the inland leg is the one that slips.

Our five camps in five environments case set shows how that list changes with climate, access and camp size.

What to Fix Before the Order

1. Camp layout — main camp position, number of forward posts, how the contract is staged along the alignment.

2. Headcount per block — cubicles, shower positions and the male-to-female split you are planning for.

3. Power — total connected load, generator or grid, and whether distribution stops at the block or the unit.

4. Water and discharge — source, storage volume, and where the tank sits relative to the blocks.

5. Delivery sequence — all at once, or in tranches that follow the paving front.

Those five answers set the packing list, the vehicle count and the price. The camp planning guide takes the same list further, and the fire safety note covers the spacing and escape requirements that a 200-unit layout has to satisfy.

We will not quote 200 units as a stand-alone line and leave the 12 to the buyer. The two numbers work as one package.

Planning a camp that moves with the works?

Send the camp layout, the headcount per block and the water and discharge plan, and we will come back with a full building list and a delivery sequence. Start the enquiry.